亚洲欧洲自拍偷拍-亚洲欧洲综合-亚洲欧洲综合网-亚洲啪在线-久久国产精品亚洲一区二区-久久国产精品一国产精品


DDGZ-1000IIIThree phase fault indicator
  • Product name: DDGZ-1000IIIThree phase fault indicator

  • Product model: DDGZ-1000III

  • Release time: 2018-07-20 09:01:14

  • Manufacturer: Great electric equipment Co., Ltd.



功能描述

Use of the environment

 

Working temperature: -25 ~ 50 C;

 

Working humidity: under ambient temperature of 25 C, the relative humidity is 0 to 90% (non condensing).

 

Workplace:

 

Below 2000m above sea level;

 

There is no conductive dust or gas or steam that destroys insulating medium.

 

No violent shock or shock;

 

Good ventilation conditions.

儀器特點

L high frequency SPWM hardware adjustment technology, fast response and stable output.

 

L high power MOS/IGBT driver, reliable operation, strong overload capacity;

 

L is suitable for various loads such as resistance, sensibility and rectification.

 

L has the protection function of overheat, overcurrent and short circuit.

 

With parameter memory function and shortcut key operation mode, it is simple and convenient to use.

 

Using SIEMENS PLC, Taiwan polyvinyl 7 inch LCD screen, software is developed independently, without input parameters, automatic test data.


技術參數

3.1 the basic requirements of the working power supply are AC 380V + 10%, and the capacity is not higher than 40kVA.

 

3.2 basic current output basic requirements

 

3.2.1 analog current amplitude (each phase): greater than 1000A.

 

3.2.2 output accuracy: less than 0.2%.

 

3.2.3 output stability: less than 0.5%.

 

3.3 basic voltage output requirements

 

3.3.1 analog voltage amplitude (each phase): greater than 10kV.

 

3.3.2 output accuracy: less than 0.5%.

 

3.3.3 output stability: less than 0.5%.

 

3.4 basic requirement of acquisition precision

 

3.4.1 acquisition precision: less than 0.1%.

 

3.4.2 frequency range: 45 ~ 55Hz.

 

3.5 basic requirements for carrying capacity

 

3.5.1 analog line perimeter (per phase): greater than 3m.

 

3.5.2 failure indicator installation: more than 60 sets.

 

3.5.3 current output power (per phase): greater than 10kVA.

 

3.5.4 voltage output power (per phase): greater than 1kVA.

 

4. analogue function description

 

4.1 load monitoring ability detection

 

4.1.1 simulate the normal operation of distribution lines:

 

A) load current simulation, and continuously output the normal load current with a maximum value of 1000A.

 

B) line voltage simulation, and continuously output the line voltage up to 10kV.

 

4.1.2 automatic detection of distribution line fault indicator is as follows: function and performance:

 

A) load current acquisition function under normal operation condition of the line, including acquisition accuracy and acquisition interval.

 

B) voltage acquisition function, including acquisition accuracy and acquisition interval.

 

C) line load power supply function.

 

D) three phase synchronization precision detection.

 

Detection of 4.2 short circuit fault identification ability

 

Simulation of interphase short-circuit fault line current and voltage changes, automatic detection of distribution line fault indicator short-circuit fault identification function, performance:

 

A) short circuit fault detection.

 

B) fault current acquisition accuracy and start error detection.

 

C) automatically determine the function of fault current alarm action value according to line load variation.

 

D) short-circuit fault current minimum duration 40ms recognition capability.

 

E) transient fault and permanent fault recognition capability.

 

F) functions such as data communication, timing, signal reset and other functions.

 

Detection of 4.3 grounding fault recognition ability

 

4.3.1 simulates different types of grounding faults:

 

A) simulate the change of line current and voltage caused by metal grounding, small resistance grounding, high resistance grounding, and arc grounding fault.

 

B) simulate the transient process of current and voltage in different grounding systems and different types of grounding faults.

 

C) the transient fault current with a maximum value of 1000A can be output.

 

D) the phase of the fault triggering time is controllable.

 

4.3.2 automatic detection of distribution line fault indicator grounding fault identification function and performance:

 

A) detection of different types of grounding faults and detection of grounding fault recognition rate.

 

B) fault current acquisition accuracy and startup error detection for small resistance grounding fault.

 

4.4 fault recording function

 

Support the recording of the current and voltage waveform of Comtrade 1999 standard recording format, compare with the waveform sent by the fault indicator, and automatically output the comparison result.

 

4.5 anti malfunction detection

 

The operation conditions such as load fluctuation, large load switching, transformer unload inrush, line closing inrush, near line fault and reclosing current are used to automatically detect the anti misoperation function of distribution line fault indicator.

 

4.6 fault case editing and execution

 

A) can edit state sequence and store according to relevant standards, such as ground fault state sequence, instantaneous short circuit fault state sequence, permanent short circuit fault state sequence and so on.

 

B) select the corresponding state sequence or fault case according to the test request, and execute the test case automatically.

 

4.7 response image recognition

 

Support distribution line fault indicator response results automatic image acquisition, identification and upload.

 

Analysis and comparison of 4.8 detection results

 

It supports automatic analysis, comparison and calculation of test results.

 

4.9 the result of detection is consistent

 

The detection result is based on the latest relevant standards of the national Power Grid Corp and the quality control and control scheme, which is consistent with the professional inspection of the network, ensuring the professional inspection of the distribution line fault indicator, the inspection before supply and the agreement of the inspection results after the arrival of the goods.

 

4.10 unified deployment of detection cases

 

Support the unified deployment of detection cases, support network professional detection report, pre supply and post delivery inspection report integration and sharing, easy to network professional testing and different provincial companies to carry out pre supply and post inspection cases, detection methods, judgment basis, and the results of the unified sharing.

 

2 upgrade and extension

 

5.1 detection project and judgment basis update

 

The corresponding testing items can be configured according to the change of the testing standards, and the basis for judging the maintenance results can be updated, so as to improve the accuracy and consistency of the test results.

 

5.2 load capacity expansion

 

It can expand the carrying capacity according to the test demand, drive the longer analog coil, and has a larger detection capability.

主站蜘蛛池模板: 日本黄页在线观看 | 午夜短视频 | 天堂电影免费在线资源 | 欧美 日韩 中文字幕 | 国产三级精品三级在线观看 | jzzjlzz亚洲乱熟在线播放 | 午夜影院黄色片 | 日本68xxxxxxxxx59| 手机看片1024国产基地 | 一级黄色录像视频 | 一区二区不卡视频在线观看 | 亚洲啪啪免费视频 | 美女久久久 | 亚洲线精品一区二区三区 | 49pao强力在线高清基地 | 包你爽综合网 | 色批网站| 午夜视频播放 | 人人看人人添人人爽 | 欧美一区福利 | 黄 色 成 年人在线 黄a大片 | 国产馆精品推荐在线观看 | 噜噜嘿 | 男人的天堂久久精品激情 | 九九久久久久午夜精选 | 免费国产高清精品一区在线 | 天天干天天爱天天射 | 国产三级日本三级日产三级66 | 女人张开腿给人桶免费视频 | 日韩三 | 日本黄色大片免费观看 | 久久青草视频 | 国产69精品久久久久9999 | 一区二区三 | 人人操天天射 | 天天鲁天天爽精品视频 | 手机在线观看一级午夜片 | 毛片爱做的片 | 国产美女亚洲精品久久久综合 | 久久婷婷久久一区二区三区 | 狠狠色狠色综合曰曰 |